PART I – MHOG Sanitary Sewer and Water Design Standards

1.         DESIGN STANDARDS   

1.0       WATER MAINS      

1.01     Water Distribution System Basis of Design        

1.02     Water Main Layout

1.03     Depth of Water Main          

1.04     Joint Restraint          

1.05     Meters           

2.0       SANITARY SEWERS          

2.01     Sanitary Sewer Basis of Design     

2.02     Sewer Location        

2.03     Depth of Sewers      

2.04     Manholes      

2.05     Service Connections           

2.06     Submersible Pump Stations          

2.07     Pressure Sewer Systems    

3.0       CONSTRUCTION PROCESS        

 

II.        REU TABLES

III.       STANDARD DETAILS

IV.       TECHNICAL SPECIFICATIONS

01500              Temporary Facilities

02140              Dewatering

02210              Excavation and Backfill (Sewer and Water Main)

02215              Horizontal Directional Drilling

02345              Casing Pipe Construction

02513              Asphalt Concrete Paving

02520              Portland Cement Concrete Paving

02660              Water Distribution

02720              Sewers

02730              Manholes and Catch Basins

02740              Sewage Force Mains

02800              Restoration Work

03315              Concrete Work

11306              Packaged Pump Stations

11308              Progressing Cavity Grinder Pump Station

11310              Centrifugal Sewage Pumps

15070              Pressure Process Piping

15110              Process Valves

16010              Basic Electrical Requirements

16110              Raceways

16120              Wires and Cables

16170              Circuit and Motor Disconnects

16480              Motor Controllers

16610              Uninterruptible Power Supply Systems

16906              Level Measurement

16930              Telephone Dialing Alarm Equipment

16932              Programmable Logic Controllers

16942              Control Panels and Consoles 

 

PART II - Genoa and Oceola Subdivision Design Standards                                     

1.0              STORM SEWERS AND STORMWATER DETENTION

1.01     Stormwater Management System Basis of Design        

1.02     Sewer Locations      

1.03     Retention/Detention Basins         

1.04     Dry Wells     

2.0       SITE GRADING AND SOIL EROSION CONTROL

2.01     Grading and Soil Erosion/Sedimentation Control Plan - Basis of Design    

2.02     Topographic Plan   

2.03     Final grading and Drainage Plan 

2.04     Soil Erosion and Sedimentation Control Plan    

3.0       STREETS AND PAVEMENT DESIGN    

3.01     Streets - Basis of Design     

3.02     Right-of-Way and Street Width    

3.03     Vertical Alignment 

3.04     Horizontal Alignment        

3.05     Intersections 

3.06     Sight Distance          

3.07     Cul-de-sacs  

3.08     Pavement Design    

4.0       CONSTRUCTION PROCESS        

 

II.        STANDARD DETAILS

III.       TECHNICAL SPECIFICATIONS

02140              Dewatering

02210              Excavation and Backfill (Sewer and Water Main)

02513              Asphalt Concrete Paving

02520              Portland Cement Concrete Paving

02720              Sewers

02730              Manholes and Catch Basins

02800              Restoration Work

03315              Concrete Work