OPEN PUBLIC HEARING # 1… Review of special use application,
site plan application and impact assessment to construct a 38,400 sq.
ft. retail and office building located on the southwest corner of Grand
River Avenue and Hubert Road, Sec. 14, petitioned by JWS, LLC. (06-15)
Planning Commission disposition of petition
A. Recommendation regarding special use
B. Recommendation regarding impact assessment (6-7-06)
C. Recommendation regarding site plan (6-30-06)
OPEN PUBLIC HEARING # 2… Review of sketch plan application and
site plan to construct a loading dock for a mobile MRI trailer located
at 7575 Grand River, Sec. 13, petitioned by St. Joseph Mercy Health
Systems. (06-16)
Planning Commission disposition of petition
A. Disposition of sketch plan. (6-21-06)
Administrative Business:
Planners report presented by LSL Planners
Approval of June 26, 2006 Planning Commission meeting
minutes
Member Discussion
Adjournment
Work Session
Minutes
CALL TO ORDER: The worksession was called to order at 6:32 p.m.
Present constituting a quorum for conducting business were: Chairman Don
Pobuda, Teri Olson, Barbara Figurski, James Mortensen, Curt Brown and
Dean Tengle.
Richard Heikkinen, Township Attorney was present. Brian Borden was
present on behalf of LSL and Tesha Humphriss was present on behalf of
Tetra Tech.
APPROVAL OF AGENDA: Motion by James Mortensen to approve
agenda. Second by Barbara Figurski. Motion carried unanimously.
DISCUSSION: of Agenda items of the regular meeting of the
Planning Commission
DISCUSSION: of general items
ADJOURNMENT: At 6:52 p.m.
Public Hearing
Minutes
CALL TO ORDER: The meeting was called to order at 7:02 p.m.
Present constituting a quorum for conducting business were: Chairman Don
Pobuda, Teri Olson, Barbara Figurski, James Mortensen, Curt Brown and
Dean Tengle. Brian Borden was present on behalf of LSL and Tesha
Humphriss was present on behalf of Tetra Tech.
PLEDGE OF ALLEGIANCE: At 7:03 p.m., the pledge of allegiance was
recited and a moment of silence was observed.
APPROVAL OF AGENDA: Motion by Barbara Figurski to approve
agenda. Second by Teri Olson. Motion carried unanimously.
CALL TO THE PUBLIC: (Note: The Board will not begin any new
business after 10:00 p.m.) No one addressed the Board at this
time.
OPEN PUBLIC HEARING # 1… Review of special use application,
site plan application and impact assessment to construct a 38,400 sq.
ft. retail and office building located on the southwest corner of Grand
River Avenue and Hubert Road, Sec. 14, petitioned by JWS, LLC. (06-15)
David LeClaire w/ Livingston Engineering and Frank Salamone, the
architect for the project were present. Petitioner presents samples
outlining colors and materials proposed for the project. EFIS will match
stone. The border will be a split faced block, bluegrass in color and
the awning is grass green. The brick will be red. Petitioner
demonstrates a sample for the glazing of the glass. It is slightly
tinted with a bronze tone, but is not reflected.
James Mortensen notes that the strip of split faced block has been
added to the exterior rear of the building, pursuant to the discussions
held at the last meeting attended by petitioner.
David LeClaire addresses the parapet and indicates it now extends all
the way around the side of the building.
Frank Salamone indicates there is screening planned for the roof with
the EFIS hiding the mechanical units on three sides. Curt Brown inquires
as to the screening coming from the EFIS or the parapet. Chairman Pobuda
indicates the purpose of the parapet is to screen everything on the
roof. Petitioner indicates this is the treatment used at other
municipalities by his company. Brian Borden indicates that the parapet
wall was going to be used as the screening. Petitioner indicates they
will raise parapet walls if that’s the Commission’s preference.
Curt Brown inquires as to any change in plans that would extend the
parapet around the side of the building, disguising the back of the
parapet. It appears that it will be disguised. James Mortensen inquires
whether screening unit is sufficient. Kelly VanMarter indicates that
generally, a parapet is required all the way around. James Mortensen
indicates he doesn’t want to require it. Petitioner offers to run
parapet all the way around the building. Brian Borden indicates that
ultimately, the goal is to make sure the roof units are not visible from
anywhere else. Petitioner will drop the bearing so that everything is
hidden behind the parapet.
The plan has been amended to reflect installation of a driveway if
the retail space is expanded, as per requested.
The landscaping of the south side was discussed. A couple of more
evergreens were added to the plan. The landscaping that was near the
pond was incorporated into the south side to increase the buffer between
this site and the residential area. The buffer zone is 20’ deep.
The drainage was discussed as it relates to the Ross property. The
pond will be changed from a detention pond to a retention/detention to
assist Mr. Ross with his drainage issues. The drainage is designed to
force overflow to go onto Hubert Road in the event of a hundred year
storm. Tesha Humphriss indicates she has not discussed this with Mr.
Ross. Brian Borden discusses the LSL letter of July 7, 2006. The
Township Board will need to grant special land use to allow for changes
in drainage. Brian Borden indicates the Board should consider limiting
delivery hours to accommodate the neighboring residents.
Chairman Pobuda asks about the doors in the rear of the building for
deliveries. Petitioner indicates any changes would be to add a double
man door, rather than an overhead door.
The shared access agreement has not been received by the Township
yet, but Kelly VanMarter updates the Commission as to the status of
that. James Mortensen indicates that Mr. Kil is obligated to provide
that, based on the approval of his site plan. Kelly VanMarter indicates
that the access agreement must be joint, with Mr. Kil providing it to
the petitioner and reversed with the petitioner providing it to Mr. Kil,
as well.
Brian Borden inquires once again as to the berm and the substitution
of evergreens for deciduous trees. Both of these were approved at the
last hearing.
Brian Borden discusses the lighting scheme for the exterior of the
building. The candle lighting must be modified so the readings do not
exceed 10.0 on the site.
Petitioner agrees. The lights will be on sensors. Petitioner will
review this.
Tesha Humphriss discusses the drainage plans recently submitted. This
plan proposes to retain the water on site and not increase the volume
leaving the site. Approval of this design is recommended. The June 21
letter from Tetra Tech was discussed. A revised set of plans were
submitted that addressed all issues in that letter.
Curt Brown discusses hours of operation. This was discussed at the
last meeting. Deliveries will be allowed from 7:00 a.m. until 8:00 p.m.
Planning Commission disposition of petition
A. Recommendation regarding special use
B. Recommendation regarding impact assessment (6-7-06)
C. Recommendation regarding site plan (6-30-06)
Motion by James Mortensen to recommend to Township Board that a
special use permit be granted for a furniture store of approximately
25,000 square ft., as petitioned by JWS, LLC, subject to following:
1. Deliveries will be held between 7:00 am and 8:00 pm;
2. Lighting during evening hours will not exceed the Township
ordinance and will be dimmed to approximately 50% of the maximum after
9:00 pm.
Second by Barbara Figurski. Motion carried unanimously.
Motion by Barbara Figurski that recommendation be made to the
Township Board to approve the impact assessment, subject to the
following:
1. Deliveries of merchandise to the site will be between 7:00 am and
8:00 pm;
2. Lighting will be dimmed to approximately 50% of the ordinance
requirements after 9:00 p.m.
Second by James Mortensen. Motion carried unanimously.
Motion by James Mortensen that it be recommended to the Township
Board to approve the site plan dated June 30, 2006 for the 38,400 sq ft
retail and office building to be located at the southwest corner of
Grand River and Hubert Road, subject to the following:
1. Signage will meet the Township ordinance;
2. The steel bearing will be dropped so as to fully screen rooftop
equipment from the view from any direction;
3. The building materials and renderings reviewed this evening by the
planning commission are acceptable and will become property o9f township
4. Cross-access easements will be obtained and recorded prior to a
land use permit.
5. Lighting will be reduced in three locations to meet the Township
ordinance.
6. The retention pond will be converted to a detention pond designed
to withstand a one hundred year flood plain, the details of which are to
be reviewed by the Township Engineer prior to Township Board;
7. The requirements for items five through eight of the Township
Engineer’s letter of June 21, 2006 will be complied with;
8. Dust control measures will be added to the site plan.
Second by Barbara Figurski. Motion carried unanimously.
OPEN PUBLIC HEARING # 2… Review of sketch plan application
and site plan to construct a loading dock for a mobile MRI trailer
located at 7575 Grand River, Sec. 13, petitioned by St. Joseph Mercy
Health Systems. (06-16)
Wayne Perry present on behalf of petitioner. Petitioner presents
proposed plans to add one dock space for the purpose of a mobile MRI
unit. The trailer containing the MRI is generally docked for a day or
two at a time and there may be as much time between visits as a few
weeks at a time. The plans provide for a small addition to be added onto
the side of the building. The purpose of this is for a ramp, more or
less, to accommodate patients going in and out of the MRI trailer. The
ramp is similar to what would be found in an airport, except that the
gap would be a mere three to five feet.
There are a few other changes to the site, as a whole proposed, to
accommodate the trailer. The axels are 11-12 feet apart and it’s quite
heavy. Therefore, some changes will need to be made to allow for the
trailer to navigate the premises.
Brian Borden addresses whether any exterior lighting will be
required. Petitioner indicates no additional lighting is required.
Tesha Humphriss discusses whether a new storm sewer structure will be
required due to widening of roads. Petitioner indicates there are two
structures existing. One will be turned into a manhole. The other will
be rotated. A new one will not be built. Tesha Humphriss indicates that’s
not what is reflected in her drawings, but it works.
Petitioner indicates he is proposing two concrete pads to accommodate
trailer.
Chairman Pobuda inquires as to what bearing the heavier truck will
have on the roads. Petitioner indicates it can drive on any road and
does not exceed any existing laws.
Tesha Humphriss indicates that catch basins 106 and 107 are
acceptable. Petitioner indicates that the truck bay cannot flood. It
drains away from the building to the north, into the service drive area
and down into the detention basin. Petitioner indicates they will
install a 2’ sump at the cement pads.
Tesha Humphriss discusses the drainage of the impervious areas. There
should be an increase in impervious area added to the plan. Petitioner
agrees to do that.
The curb on the access ramp was discussed. Petitioner submitted a
sketch plan and not an entire set of construction documents. The
pavement plan should be included and petitioner agrees.
Planning Commission disposition of petition
A. Disposition of sketch plan. (6-21-06)
Motion by James Mortensen that this sketch plan be approved,
subject to the following:
1. The requirements of the Brighton Fire Department as spelled out in
their letter dated 6-30-06 of will be met;
2. Dust control measures will be added to the sketch plan;
3. The requirements spelled out in items one, three and four of Tetra
Tech’s letter of July 5, 2006 will be complied with. In addition, the
one foot diameter catch basins are acceptable for numbers 107b and 106c
with a two foot sump;
Support by Barbara Figurski. Motion carried unanimously.
Administrative Business:
Planners
report presented by LSL Planners.
There
was no report by Brian Borden.
Approval
of June 26, 2006 Planning Commission meeting minutes.
The
minutes of the June 26, 2006 Planning Commission minutes were approved
upon motion of Barbara Figurski and second by James Mortensen, subject
to a change outlining the address of Bill Ross, who addressed the Board.
Motion carried unanimously.
Member
Discussion.
Kelly
VanMarter advises there will not be another meeting in July and nothing
has been submitted to date for the August 14 meeting.
Meeting