PLANNING
COMMISSION
MAY 9, 2005
AGENDA
OPEN PUBLIC HEARING # 1… Review of PUD
agreement amendment, site plan and environmental impact assessment for a
proposed retail building located on the south side of Grand River Avenue
at Lawson Drive. Sec. 9, petitioned by Boggio and Associates. (PC 05-06)
OPEN PUBLIC HEARING # 2…
Review of PUD agreement amendment, final PUD site
plan and impact assessment for a proposed 21,897 sq. ft. Tractor Supply
Store with a 26,870 sq.ft. of outdoor display located on northeast
corner of E. Grand River and Lawson Drive, Sec. 9, petitioned by Bunnell
Hill Development Co., Inc. (05-14)
OPEN PUBLIC HEARING # 3…
Review of site plan and environment impact
assessment for a proposed retail and restaurant building (Savannah
South) located on the south side of Grand River Avenue, between Latson
Road and Lawson Drive within the Savannah Development, Sec. 9,
petitioned by Savannah Development, LLC. (05-21)
OPEN PUBLIC HEARING # 4…Review of site plan and impact assessment
for a proposed 7,820 sq. ft. office and showroom building for a Pro
Brothers Windows and Sunroom located on the south side of Grand River
Avenue, between Dorr Road and Kellogg Road, Sec. 14, petitioned by
Lindhout Associates Architects. (05-20)
Administrative Business:
Planners
report presented by LSL Planners
Approval of
April 25, 2005 Planning Commission meeting minutes.
Member
Discussion
Adjournment
MINUTES
WORKSESSION
The work session of the Planning Commission
was called to order by Chairman Don Pobuda at 6:30 p.m. The following
commission members were present constituting a quorum for transaction of
business: Don Pobuda, James Mortensen, Curt Brown, Teri Olson, and Dean
Tengel. Also present was Kelly Kolakowski, Township Planner; Brian
Borden from Langworthy, Strader, LeBlanc & Associates, Inc. and
Tesha Humphriss from Tetra Tech, MPS. By
the end of the work session, there were a few persons in the audience.
Items scheduled for action during the regular session of the
commission were discussed.
PUBLIC HEARING
The regular session of the Planning Commission was called to
order by Chairman Don Pobuda at 7:05 p.m.
The Pledge of Allegiance was recited and a moment of silence
was observed.
Moved by Brown, seconded by Mortensen, to approve the
Agenda as written.
The motion carried unanimously.
The call to the public was made to discuss items not on the
agenda. There was no response and the call to the public was closed at 7:06 p.m.
Chairman Pobuda noted that the Board will not begin any new business after 10:00
p.m.
OPEN PUBLIC HEARING # 1… Review of PUD agreement
amendment, final PUD site plan and impact assessment for a proposed 21,897 sq.
ft. Tractor Supply Store with a 26,870 sq. ft. of outdoor display located on
northeast corner of E. Grand River and Lawson Drive, Sec. 9, petitioned by
Bunnell Hill Development Co., Inc. (05-14)
Planning
Commission disposition of petition.
A. Recommendation
regarding PUD amendment. (4-20-05)
B. Recommendation
regarding impact assessment (3-7-05).
C. Recommendation
regarding final PUD site plan (3-9-05).
Mr. Larry Sims of Bunnell Hill Development, and Mr. Doug
Gardner, the project engineer, were present to represent the petitioner.
Mr. Sims stated they have made the changes that were
recommended at the previous Planning Commission meeting and subsequent
worksession with regard to the fencing. There was discussion at these
meetings if the outdoor sales should be included in the overall square
footage for the PUD and it was decided that this would not be counted.
They feel that 101 spaces is sufficient for their use. He showed colored
site plan, renderings, and building materials.
Mr. Borden reviewed his letter of May 3, 2005.
-
Planning Commission approval is required for all
architecture and building materials. Mr. Sims showed which materials
will be where on the building. Commissioner Tengel stated since there
is no sample of the mesh fabric that will be used for the fencing, he
suggested it be approved administratively. Chairman Pobuda is not in
favor of any fabric and/or net on the site. He also does not want any
cyclone fencing as that is what was stated on the original PUD.
-
The PUD Agreement needs to be amended to permit a
reduction in parking as the petitioner is only proposing 101 spaces.
Chairman Pobuda stated that the Planning Commission has taken the
position that if the petitioner feels they only need 101 then it would
be approved. Commissioner Mortensen’s concern is that if the use
changes, the parking may not be sufficient. Mr. Sims stated they have
outside sales area that could be converted to parking if there were a
need in the future. Commissioner Brown’s concern is if the use
changes, what would happen with the outdoor storage area. If different
things are going to be sold, the Township may want to not allow
outdoor sales. Ms. Kolakowski stated that the PUD states that there be
no outdoor sales and display next to Grand River, but suggested that
the Commission amend the PUD Agreement to allow for outdoor sales
specific to Tractor Supply. Commissioner Mortensen suggested it speak
to the types of items and not the actual vendor.
-
One additional barrier free space is required. The
petitioner will add this space.
-
The landscape plan is deficient for the detention pond
plantings by 100. Commissioner Mortensen feels they have provided a
lot of landscaping and added additional to the north that was not
required. There was a discussion regarding the landscaping on the east
side of the site. The petitioner stated they have the DTE overhead
power line easement on that side, which dictated where they could
plant these trees and shrubs. Chairman Pobuda would like to see more
trees and shrubs on the overall site. Commissioner Tengel would like
the 27 deficient shrubs planted at the detention pond. The petitioner
will comply with this request. Commissioner Brown feels the outdoor
sales area is too large and if it were reduced, they could plant more
landscape and meet the requirements. Mr. Borden stated they are
deficient by 88 shrubs, 10 canopy trees, and 15 evergreen trees, but
these can be planted anywhere on the site to meet the ordinance.
Commissioner Mortensen stated that if the Planning Commission wanted
the requirement met, they need to do it and not allow them to
arbitrarily plant them on the site. If what they have proposed for the
east side provides adequate screening, then that should be sufficient.
Commissioner Tengel suggested planting the 88 shrubs along the east
and north side of the display area. Commissioner Brown would like the
landscaping to be able to fit and then determine where the building
should be and not place the building and then see if the required
landscaping fits. It was agreed that 88 shrubs will be planted close
to the display area along the east and north sides.
-
The light fixture detail needs to be provided and the
intensity exceeds the requirement. Ms. Kolakowski feels this can be
addressed and approved administratively before they present their plan
to the Township Board.
Ms. Humphriss reviewed her letter of May 4, 2005.
-
The proposed lawn slope for the detention pond is 1:3.
Genoa Township requires a 1:4 slope. The Planning Commission needs to
approve the 1:3 slope and if it is approved it needs to be fenced. Mr.
Sims stated they are proposing a four-foot black fence. Ms. Kolakowski
advised that at previous meetings, it was agreed that the fence will
be black metal. All Commissioners agree with allowing the 1:3 slope
with the black fence.
-
The detention pond is sized for Phase I only and it
will need to be modified when Phase II is developed.
-
The petitioner needs to clarify if the outlet rate for
the detention pond meets Livingston County Drain Commission standards.
-
It was agreed at staff meetings that a traffic study
is not needed at this time; however, one should be required when
future development to this site is proposed.
Commissioner Tengel asked to review the issue of the
fencing. He stated he would prefer that the detention pond be nicely
landscaped with boulders and shrubs instead of fenced. He feels that if
the Township is allowing the 1:3 slope, then some concessions should be
made by the petitioner. He does not want fencing on the front of the site.
Chairman Pobuda and Commissioner Brown agree. Ms. Humphriss stated that a
fence is required when the slope is steeper than 1:3 based on the Drain
Commissioner’s requirements. Mr. Tengel noted that other developments in
the area, such as Savannah, have bolder-type walls surrounding retention
ponds.
Commissioner Mortensen questioned if the Drain
Commissioner will allow boulders and landscaping to be put there instead
of a fence. Ms. Humphriss is not sure; however, a way to eliminate the
fence is to change it to 1:4 slope, which would mean making the parking
lot smaller. Commissioner Tengel does not feel this is an appropriate
place for a 1:3 slope since the fencing is required. Commissioner Brown
agrees.
Commissioner Mortensen stated that this is an industrial
site that was rezoned to commercial. It is 250 feet from Grand River with
two buildings in front of it and it was previously decided to add 27
shrubs to the detention pond. Chairman Pobuda stated the reason it was
rezoned was so an upscale development would be put there as this is the
gateway to the Township. Commissioner Olson does not have a problem with
the fence, especially since the shrubs were added. Chairman Pobuda is not
in favor of the fencing.
Mr. Sims stated that the fencing was approved during all
of their previous work sessions. They are not prepared to make changes at
this time. They have addressed all of the requests that were made at the
previous Planning Commission meetings and work sessions. They would like
to have a vote on this project as presented this evening. Commissioner
Mortensen noted there were 21 issues in the engineering letter and the
issue of lighting that is in the consultant’s most recent letter was
discussed previously and was still not addressed prior to this meeting.
The call to the public was made at 8:08 p.m.
Ms. Elaine Groat of 612 Sunrise Park Drive asked what the
distance is between the property line of Sunrise Park residences and the
building and is it such a narrow area. It seems to be close and this will
reduce the property values of these homes. It is very upsetting that it is
that close to the residences. She stressed that if this project is
approved, that dust control measures be implemented. She questioned if the
area is staked out so the residents can visit the site.
Mr. Todd Smith of Thompson Brown stated that with regard
to the stone retaining wall suggested for the detention pond, the County
requires the specific slope so that if someone falls in they can get out.
With reference to the Savannah development, they do have the stone wall,
however, there is an area where someone could get out if they fell in.
Mr. Harvey Weiss, of Weiss Properties, understands the
Planning Commission and Mr. Tengel’s concerns regarding the slope. There
have been many meetings and this is the first time this has been brought
up. Before denying them or tabling it, he would like the Planning
Commission to work with them to reduce the slope or amend the screening.
These petitioners have worked very hard on this project.
The call to the public was closed at 8:14 p.m.
Mr. Gardner addressed Ms. Groat’s concerns. It is 35
feet from the display area to the property line and the building is 160
feet from the property line. He showed an aerial view, which showed where
some of the homes are at the property line or very close to the line. The
site is not currently staked out.
Commissioner Mortensen wanted to remind the public that
this was zoned industrial before it was rezoned commercial.
Chairman Pobuda understands that the petitioner has worked
hard on this, but work sessions are administrative and these seven people
on the Commission make the final decisions. The Planning Commission’s
duty is to address the betterment of the entire Township.
Commissioner Tengel reiterated that he is only opposed to
the fencing. If this can be eliminated he would be in favor of the
project.
Moved by Mortensen, seconded by Tengel, to recommend
to the Township Board approval of the PUD Amendment presented this evening
for a proposed 21,897 sq. ft. Tractor Supply Store with a 26,870 sq. ft.
of outdoor display located on northeast corner of E. Grand River and
Lawson Drive, Sec. 9, petitioned by Bunnell Hill Development Co., Inc.
with the following conditions:
-
Paragraph 3.5 will eliminate the reference to the
Township constructing White Horse Drive. It is the intent that a
future road be constructed; however, the Township will not be the ones
to construct such a road.
-
Paragraph 3.5 shall read “any design and change of a
road within the PUD Site will be done at the developer’s expense”.
-
The Agreement shall be reviewed by the Township
Attorney.
-
Approval by the Township Board of the Site Plan as
discussed this evening.
The motion carried (Tengel - yes; Brown – no; Mortensen
– yes; Pobuda – no; Olson – yes).
Chairman Pobuda stated that he is not voting for it
because he does not feel this is the proper site for this development.
Moved by Mortensen, seconded by Olson, to recommend to
the Township Board approval of the Impact Assessment with a revision date
of April 18, 2005 for a proposed 21,897 sq. ft. Tractor Supply Store with
a 26,870 sq. ft. of outdoor display located on northeast corner of E.
Grand River and Lawson Drive, Sec. 9, petitioned by Bunnell Hill
Development Co., Inc.
The motion carried (Tengel - yes; Brown – no; Mortensen
– yes; Pobuda – no; Olson – yes).
Moved by Mortensen, seconded by Tengel, to recommend
to the Township Board approval of the Final PUD Site Plan dated April 20,
2005 for a proposed 21,897 sq. ft. Tractor Supply Store with a 26,870 sq.
ft. of outdoor display located on northeast corner of E. Grand River and
Lawson Drive, Sec. 9, petitioned by Bunnell Hill Development Co., Inc.
with the following conditions:
-
The architecture and materials reviewed this evening
are acceptable and will become the property of the Township.
-
The mesh or fabric that will be added to the cyclone
and ornamental fencing on the east side of the property line will be
earthtone and approved administratively.
-
The reduction to 101 parking spaces versus the
Township ordinance is acceptable; however, one additional barrier-free
space will be added.
-
The east/west road on the entrance portion of the
property will be temporary until alternative solutions can be
developed and the improved road will have curb and gutter and will be
completed by July 1, 2007.
-
Twenty-seven additional shrubs will be placed around
the retention pond and 88 shrubs will be placed near the east property
line.
-
The detail for the light fixtures and a photometric
study of the lighting will be completed and reviewed administratively
prior to presentation to the Township Board.
-
A 1:3 slope will be acceptable for the detention pond,
provided there is no fencing. If the only alternative is a 1:4 slope,
this will entail reengineering the site and the Planning Commission
request that the proposal be remanded back to the Planning Commission.
-
With regard to the items in TTMPS’s letter dated May
4, 2005, the petitioner should be aware that Items #3, 6, and 10
require MDOT approval.
-
Items #4, 5, 11, 14, 18, 19, and 20 of the TTMPS
letter dated May 4, 2005 shall be complied with.
The motion carried (Tengel - yes; Brown – no; Mortensen
– yes; Pobuda – no; Olson – yes).
Chairman Pobuda again reiterated his reasons for voting
against the project. It is not an upscale use and is not an anchor store
that was proposed originally.
OPEN PUBLIC HEARING # 2… Review of PUD agreement
amendment, site plan and environmental impact assessment for a proposed
retail building located on the south side of Grand River Avenue at Lawson
Drive. Sec. 9, petitioned by Boggio and Associates. (PC 05-06)
Planning Commission disposition of petition.
-
Recommendation regarding PUD amendment. (4-20-05)
-
Recommendation regarding impact assessment (3-7-05).
-
Recommendation regarding final PUD site plan (3-9-05).
Michael Boggio of Michael Boggio Associates, the
architect, and Harvey Weiss, the property owner, were present.
Mr. Boggio showed the site plan for the entire PUD as well
as a colored site plan for Outlot #1 and colored elevations. They are
proposing to build a 6,750 square foot, multi-tenant building. He reviewed
the site layout and traffic pattern.
He feels that the site plan was favorably received at the
last meeting; however, it was suggested that the architecture and rear
elevation be changed. They have pushed out part of the building on the
southwest corner as well as changed the rear elevation to remove the
spandrel glass and add real glass. He showed building material samples.
Mr. Borden reviewed his letter of May 3, 2005.
-
Planning Commission approval is required for all
architecture and building materials. All Commissioners like the
changes that were made.
-
It is suggested that the reference to “Krispy Kreme”
should be changed to “coffee shop” in the PUD Agreement. All
Commissioners, except Chairman Pobuda, agree with allowing the drive
thru. He does not feel that this is the right place in the Township
for a drive thru.
-
The number of Hicks Yew plantings exceeds the 33%
maximum for one species; however, he believes this is due to the
required hedgerow along Grand River. All Commissioners agreed to allow
it.
-
The PUD required that ornamental lighting be installed
along Grand River. The petitioner will comply with this requirement.
-
There should be an amendment to the PUD Agreement
addressing the issue of signage on the rear of the building that
applies to all buildings on the site. Mr. Weiss requested that this
restriction only be applied to this building and not all of the other
outlots. With this building, there are more than one tenant and that
would be too many signs, he agrees, however, other buildings may only
be single users. Commissioner Mortensen suggested that the language
stated that dual signage on buildings be approved by the Planning
Commission on a case-by-case basis. Mr. Weiss agreed to this.
Ms. Humphriss reviewed her letter of May 3, 2005.
-
A traffic study is not needed at this time; however,
she suggested that as the site develops, updates to the traffic study
be required.
-
The easement for the proposed grading within Outlot #2
should be recorded prior to construction.
-
They are proposing to live tap the existing water main
along Lawson Drive and this needs to be observed by a representative
of the utility.
-
A permit from the Livingston County Building
Department is required for the installation of the water and sewer
leads.
The call to the public was made at 8:55 p.m. with no
response.
Moved by Mortensen, seconded by Tengel, to recommend
to the Township Board approval of the PUD Amendment reviewed this evening
for a proposed retail building located on the south side of Grand River
Avenue at Lawson Drive. Sec. 9, petitioned by Boggio and Associates with
the following conditions:
-
Review by the Township Attorney.
-
Paragraph N on Page 2 of the Amendment shall be
revised to read “The customer drive-thru facility shall only be
permitted for the sale of donuts, bagels, pastries, coffee and related
similar beverages”
-
This Amendment will be expanded to provide that no
signage will be permitted on the rear or side of any buildings
anywhere on the PUD site without the approval of the Township Planning
Commission.
The motion carried (Tengel – yes; Brown – yes;
Mortensen – yes; Pobuda – no; Olson – yes).
Chairman Pobuda wanted the record to reflect that he voted
no because the original intent for these outlots was for one building and
use per lot and as this is the gateway to the Township, no drive-thrus
were to be permitted.
Moved by Brown, seconded by Mortensen, to recommend to
the Township Board approval of the Impact Assessment dated January 11,
2005 for a proposed retail building located on the south side of Grand
River Avenue at Lawson Drive. Sec. 9, petitioned by Boggio and Associates.
The motion carried (Tengel – yes; Brown – yes; Mortensen – yes;
Pobuda – no; Olson – yes).
Moved by Mortensen, seconded by Olson, to recommend to
the Township Board approval of the Final PUD Site Plan for a proposed
retail building located on the south side of Grand River Avenue at Lawson
Drive. Sec. 9, petitioned by Boggio and Associates with the following
conditions:
-
The architecture and materials are acceptable and the
samples will become the property of the Township.
-
The lighting plan will be reviewed administratively by
Township staff to ensure that it is consistent with the last review.
-
Ornamental lighting consistent with that used in the
surrounding area will be installed on the site along Grand River.
-
Signage will be consistent with the amendment to the
PUD Agreement made by recommending motion this evening.
-
The recommendations of the Township Engineer set out
in their letter dated May 3, 2005 will be complied with; however, with
respect to Item #1 referencing traffic studies, the Planning
Commission will determine on a case-by-case basis if it required.
The motion carried (Tengel – yes; Brown – yes;
Mortensen – yes; Pobuda – no; Olson – yes)
Chairman Pobuda called for a break from 9:05 to 9:10 p.m.
OPEN PUBLIC HEARING # 3… Review of site plan and
environmental impact assessment for a proposed retail and restaurant
building (Savannah South) located on the south side of Grand River Avenue,
between Latson Road and Lawson Drive within the Savannah Development, Sec.
9, petitioned by Savannah Development, LLC. (05-21)
Planning
Commission disposition of petition
A. Recommendation
regarding impact assessment (4-19-05)
B. Disposition
regarding site plan. (4-19-05)
Todd Smith and Mark Leonard from Savannah South, and Jeff
Smith, the engineer, were present.
Todd Smith gave a brief description and history of the
site. Two buildings have been developed on this site. They will continue
with the same architecture and materials that were used with the other two
buildings. He showed colored renderings and sample building materials.
They have moved the building very close to the west property line;
however, there is 250 feet of natural landscape buffer to screen them from
the use on this side. They are proposing a multi-tenant building, but do
not have any prospective tenants at this time. He would like one of the
uses to be a restaurant and has calculated the parking requirement to
accommodate this.
He noted that there is an issue with the access drive to
the east. When Leo’s was developed on the front of the site, they were
allowed to put their dumpster in the area where this was to be located. He
noted that the he was at both the Planning Commission and Board Meetings
and voiced his opposition to this. He would like to provide the access
drive from the site discussed this evening; however, he would lose five
parking spaces and he feels he need all of the parking that he has
proposed. He added that he would like to add a walking path to link his
property to Leo’s site in order to assist in pedestrian traffic flow.
Chairman Pobuda asked the petitioner if they can afford to
lose the five parking spaces to provide for the easement drive. Todd
stated the he feels that he needs those spaces; however, once the building
is completely leased, he would know what his needs are.
All Commissioners agreed to leave the temporary access
drive issue to be handled when the building is completely leased.
Commissioner Brown stated that he likes the building but
possibly it’s too large and there is too much impervious surface. Todd
stated that they need to have a building this size in this market. It is
at the end of a long drive and behind two other buildings. They wanted to
allow for the restaurant and that is what is increasing the parking needs.
Commissioner Mortensen stated it is very hard to tell what
parking is required when the petitioner does not even know what the
tenants will be as well as what will evolve in the future.
Mr. Borden reviewed his letter of April 29, 2005.
-
The driveway on the west side of the building does not
meet the 10-foot setback requirement and will require a variance from
the ZBA
-
Planning Commission approval is required for the
architecture and materials.
-
The Planning Commission has to approve utilizing the
existing vegetation on the west as the required buffer zone. All
Commissioners agree.
-
A photometric grid needs to be provided. Todd stated
they are proposing gooseneck fixtures and will meet the ordinance
requirements with regard to intensity.
Ms. Humphriss reviewed her letter of May 4, 2005.
-
A “Do Not Enter” sign should be placed on the
northern exit of the delivery area to indicate southbound traffic is
not permitted. The petitioner will comply.
-
The petitioner will need Livingston County Drain
Commission approval for the underground detention as well as the
detention basin coefficients
-
The petitioner should upsize the two four-foot
diameter manholes at a minimum of five-foot diameter.
The call to the public was made at 9:50 p.m. with no
response.
Moved by Mortensen, seconded to Tengel, to recommend
to the Township Board approval of the Impact Assessment with a revision
date of April 19. 2005 for a proposed retail and restaurant building
(Savannah South) located on the south side of Grand River Avenue, between
Latson Road and Lawson Drive within the Savannah Development, Sec. 9,
petitioned by Savannah Development, LLC. The motion carried (Tengel-
yes; Brown – no; Mortensen – yes; Pobuda – yes; Olson – yes).
Moved by Mortensen, seconded by Tengel, to approve the
Site Plan for a proposed retail and restaurant building (Savannah South)
located on the south side of Grand River Avenue, between Latson Road and
Lawson Drive within the Savannah Development, Sec. 9, petitioned by
Savannah Development, LLC. with the following conditions:
-
The existing easement near the traffic island of Leo’s
Coney Island will remain as is.
-
ZBA approval is required for the west side driveway
because it does not meet the 10-foot set back requirement.
-
The proposed architecture and materials will match
Phase I and sample materials will become the property of the Township.
-
The petitioner agrees to meet all Township ordinances,
particularly with reference to lighting.
-
Items #1, 3, 4, 5, 6, 7, 8, 9 and 10 from the Township
Engineer’s letter dated May 4, 2005 will be complied with.
-
A waiver of the ordinance regarding plantings on the
west property line is approved in order to permit the petitioner to
utilize the existing vegetation.
The motion carried (Tengel- yes; Brown – no; Mortensen
– yes; Pobuda – yes; Olson – yes).
OPEN PUBLIC HEARING # 4…Review of site plan and
impact assessment for a proposed 7,820 sq. ft. office and showroom
building for a Pro Bros. Windows and Sunroom located on the south side of
Grand River Avenue, between Dorr Road and Kellogg Road, Sec. 14,
petitioned by Lindhout Associates Architects. (05-20)
Planning
Commission disposition of petition
A. Recommendation
regarding impact assessment. (4-22-05)
B. Disposition
regarding site plan. (04-22-05)
Mr. Joe Chidester of Lindhout Associates, Mr. Dave
Provenzola of Pro Bros., and Roland Alix of Boss Engineering were present.
Mr. Chidester stated that at the Township Board meeting
for Trends in Tile, which is proposed to be developed next to this site,
the Board asked them to revise their architecture to meet the downtown
standards. They have made similar changes to this evening’s submittal
based on those comments. He distributed colored renderings of the new
proposed Pro Bros. as well as the revised renderings for Trends in Tile.
Commissioner Olson stated that she is unsure as to what is
desired by the Township for the downtown area. Ms. Kolakowski stated they
are going to be working with LSL to develop some design standards and the
May 23, 2005 Planning Commission meeting to discuss this further.
Mr. Chidester continued that in keeping with the
recommendations that were made with regard to Trends in Tile, they have
made the changes to Pro Bros.’ Grand River elevation. They have removed
the sunroom that was on this elevation. There was a discussion regarding
the sunrooms still being located on the east side of the building and
visible from Grand River. Mr. Provenzola stated he would like to be able
to display sunrooms as this is their business, similar to how car
dealerships have cars in their parking lots. If they are not allowed to
display these in the front, then they would pull out of the purchase of
this property.
Commissioners Tengel and Olson would allow the sunrooms.
Commissioner Brown does not feel it is appropriate. Commissioner Mortensen
stated he would allow the sunrooms if major revisions to the architecture
were made. He does not like the building. All Commissioners agreed that
changes need to be made to the architecture of the building.
Mr. Borden reviewed his letter of April 29, 2005.
-
Planning Commission approval is required for the
proposed architecture and building materials.
-
A less visible location is recommended for the
dumpster enclosure as it is visible from Grand River.
-
The driveway along Grand River needs to be aligned
with the opposite driveway unless the Road Commission approves it as
is. Jeff stated that he has spoken with the Road Commission and they
are willing to work with the petitioner. Ms. Humphriss also spoke to
the Road Commission and agrees with Mr. Borden that it is ultimately
the Road Commission’s decision.
-
They recommend that the easement for a future service
drive be shifted slightly to the north for better alignment with the
development to the west as well as it being installed during the
construction of the building and not at a future time. Mr. Chidester
believes that the proposed location is the best location for this
driveway. If it is moved further north, they would be granting an
easement through the middle of their site and potentially impeding any
future parking or building development on their site. All
Commissioners agree with allowing the easement where it is proposed.
Ms. Humphriss reviewed her letter of May 4, 2005.
-
Since the proposed retention pond is designed with an
emergency spillway to the property to the west, she suggests that
documentation indicating approval of this is provided and a 154-foot
wide easement and agreement for the overflow be indicated on the plans
and obtained. The petitioner’s engineer is in the process of
securing this easement.
-
The proposed lawn slope surrounding the retention pond
is a 1:3 slope and the Township requires a 1:4 slope. If the Planning
Commission approves a 1:3 slope, then additional stabilization
measures should be implemented. She noted that even though this is the
back of the site, the property to the rear is zoned residential. She
added that this is a difficult area of the Township with regard to
drainage. An ideal situation is for both sites to work together;
however, they are not being developed at the exact same time. She
feels the best solution would be a regional detention pond be
developed. Jeff stated that they have met all of the Drain
Commissioner’s standards and they do not know how the property to
the rear is going to be developed.
This led to a discussion regarding the property to the
rear. The question was raised as to what the Township envisions in this
area. Commissioner Mortensen feels it is urgent that the Township
determine what is going to be developed on the site behind these two lots.
Ms. Kolakowski stated that this property is being planned to be included
in the downtown PUD development. It is currently zoned rural residential,
two-acre minimum lot size. She enforced that these two parcels are still
zoned general commercial. Commissioner Tengel stated that these properties
would be developed first and whoever developed the residential parcels
would need to determine what would need to be done to screen the homes
from the commercial buildings. Mr. Mortensen agrees; however, he feels
that the Township needs to keep that zoning in mind when deciding on the
rear architecture and detention ponds at the rear of the site.
Commissioner Tengel stated that he would not like to see a pond surrounded
by a fence on each site.
The call to the public was made at 10:44 p.m. with no
response.
Commissioner Mortensen suggested that the petitioner meet
with staff and present different building renderings and he also asked
them to consider the drainage discussion that was held this evening. He
reiterated his concerns with the appearance of the rear of these sites due
to the property that abuts them.
Mr. Chidester stated that it is hard for them to make
architectural changes when they do not have any design standards.
Moved by Mortensen, seconded by Olson, to table Agenda
Item #4 at the request of the petitioner. The motion carried
unanimously.
Moved by Mortensen, seconded by Olson, to approve the
minutes of April 25, 2005. The motion carried unanimously.
Member Discussion
Ms. Kolakowski stated that there are no items for the May
23, 2005 Planning Commission meeting; therefore, a joint meeting between
the Planning Commission, the ZBA, and the Township Board will be held to
discuss zoning amendments as well as the downtown district.
The meeting adjourned at 11:00 p.m.
Submitted by: Patty Thomas, Recording Secretary
Approved by: Barbara Figurski, Secretary
|